Factory wholesale Spare Part Concrete Pump - Delivery Pipe – ANCHOR
Factory wholesale Spare Part Concrete Pump - Delivery Pipe – ANCHOR Detail:
|
Part number |
Type |
Thickness (mm) |
Length (mm) |
Weld-on ends |
Applicable pump |
Brands material |
|
SJT-1 |
DN125 (5″) |
4.0 |
3000 2000 1000 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
ST52 ST37 20# Q235 |
|
SJT-2 |
DN125 (5″) |
4.5 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-3 |
DN125 (5″) |
7.1 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-4 |
DN125 (5″) |
4.0 |
Schwing F/M |
Schwing |
||
|
SJT-5 |
DN125 (5″) |
4.5 |
Schwing F/M |
Schwing |
||
|
SJT-6 |
DN125 (5″) |
7.1 |
Schwing F/M |
Schwing |
||
|
SJT-7 |
DN125 (5″) |
7.1 |
ZX-F/M |
Putzmeister |
||
|
SJT-8 |
DN100 (4″) |
4.0 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-9 |
DN100 (4″) |
4.5 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-10 |
DN100 (4″) |
6.0 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-11 |
DN80 (3″) |
4.0 |
98mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-12 |
DN80 (3″) |
4.5 |
98mm |
Schwing, Putzmeister CIFA Kyokuto |
||
|
SJT-13 |
DN150 (6″) |
8.0 |
ZX-F/M |
Putzmeister |
||
|
SJT-14 |
DN150 (6″) |
8.0 |
3000 2000 1000 |
6HD |
Schwing, Putzmeister CIFA |
|
|
SJT-15 |
DN125 (5.5″) |
4.5 |
5HD |
Schwing, Putzmeister CIFA |
||
|
SJT-16 |
DN100 (4″) |
4.0 |
4HD |
Schwing, Putzmeister CIFA |
||
|
SJT-17 |
DN80 (3″) |
4.0 |
3HD |
Schwing, Putzmeister CIFA |
||
|
SJT-18 |
DN125 (5.5″) |
6.5 |
Sany- 157mm |
Sany |
||
|
SJT-19 |
DN125 (5.5″) |
6.5 |
ZoomlionF/ M-175mm |
Zoomlion |
||
|
SJT-20 |
We can also produce the special concrete pump delivery pipes, 2″-8″,length 500mm-6000mm,thickness:3mm-15mm, or according to the customer’s specific requirements. |
|||||
The product is made of the special material steel tubes,after quenching inside it.Carburizing chemical treatmeat,Flange sleeving,Its hardness reaches 58-62 degrees.The life of pipeline increases 3-5 time.So that can make users save time,Coat and the trouble of changing tubes and improve production efficiency.
SRUCTURE
|
Name |
Structure |
HRC |
Thickness mm |
Structure Sketch Map |
|
Base Material |
Pearlite & Ferrite |
23 |
2.5 |
Abrasionresist layer/ Crackresist layer |
Life Comparison & Quality
|
Name |
Material |
Structure |
Characteristic |
Life (squre) |
life (squre) |
|
Normal |
20 |
Monolayer |
Low cost,rapid abrasion,short life |
7000-8000 |
|
|
High Quality |
Alloysteel |
Monolayer |
High cost,long life |
20000-25000 |
|
|
Hardening (doublelayer) |
Alloysteel |
Double |
Higher cost with abrasion resist wall and crack resist ektexine.4-5 times longer life |
38000-45000 |
Product detail pictures:
Related Product Guide:
Bear "Customer initially, High-quality first" in mind, we work closely with our prospects and supply them with efficient and specialist companies for Factory wholesale Spare Part Concrete Pump - Delivery Pipe – ANCHOR , The product will supply to all over the world, such as: Grenada , Denver , Denver , We set a strict quality control system. We have return and exchange policy, and you can exchange within 7 days after receive the wigs if it is in new station and we service repairing free for our products. Please feel free to contact us for further information if you have any questions. We are glad to work for every client.
By Mignon
from Sao Paulo
- 2017.09.29 11:19
In our cooperated wholesalers, this company has the best quality and reasonable price, they are our first choice.
By Ray
from Afghanistan
- 2017.10.27 12:12












